
Connecting the network, engineered for the road ahead.
From temporary traffic management and light civil engineering through to pole placement, fibre deployment, splicing and customer connection — delivered by experienced operatives across the UK.

Traffic Management · Light Civils · Customer Connection
- SERVICES -
What we do.
Multiple disciplines, one operational standard. From a single 4-way light hire to a full fibre route built, spliced, tested and connected. We run jobs that finish on time and to spec.
/ 01
Temporary Traffic Management
Stop/go, lane closures, two-way light systems and full carriageway closures - designed, signed and stewarded to Chapter 8.
Forecasted road closures, diversions, advanced warnings and public access management.
Route Planning & Road Closures
/ 02
/ 03
Portable Signals & Managed Lights Hire
2, 3 and 4 way radio-linked portable signals. Battery or hybrid units, delivered, installed and serviced for the duration of the works.
Excavation, ducting, chambers and reinstatement, plus telegraph pole supply, placement and recovery - the groundwork the network is built on.
Light Civil Engineering & Poling
/ 04
/ 05
Overhead and underground cabling, blowing and pulling, fusion splicing, and full OTDR and power-meter test and handover
Fibre Deployment, Splicing & Testing
/ 06
Final-drop and in-home installation of broadband and other systems - activated, speed-tested and handed over as a working service.
Customer Connections
- WHY YOTTAWATT -
Operational discipline, on every job.
We don't sub-contract our reputation. Every operative on site is employed, accredited and managed against a single set of standards - the same whether its a council schedule or a 30-minute emergency callout.
24/7 emergency response, southwest dispatch
NRSWA / LANTRA Streetworks qualified operatives
Chapter 8 compliant signing, lighting & guarding
Live job tracking and on-site documentation
Civils, poling, fibre & connection deliver in-house

- APPROACH -
How a job runs.
From first call to demobilisation. A defined four-stage process so every project - planned or reactive - is delivered against a clear standard.
STAGE 01
Brief & survey
Site walk, traffic count, risk assessment. We design the scheme around your works - not a template.
STAGE 02
Plans & permits
Drawings, road space booking and Streetworks notices submitted on your behalf. No paperwork sent back.
STAGE 03
Mobilise
Crews, kit and signage on site, on time. Pre-shift briefings logged. Live progress shared with your PM.
Manage & close
STAGE 04
Daily checks, reactive cover and full demob. Sign-off pack delivered with sign sheets and incident logs.

© 2026 Yottawatt