top of page
Yottawatt TM Logo_edited.png

Connecting the network, engineered for the road ahead.

From temporary traffic management and light civil engineering through to pole placement, fibre deployment, splicing and customer connection — delivered by experienced operatives across the UK.

Plan a Project View Services
Roadworks · Lane closures · Trenching & Reinstatement · Pole Placement · Cabling & Pulling · Fibre Slicing · Customer Connections ·
Gemini_Generated_Image_prpqc1prpqc1prpq_edited.png

Traffic Management · Light Civils · Customer Connection

- SERVICES - 

What we do.

Multiple disciplines, one operational standard. From a single 4-way light hire to a full fibre route built, spliced, tested and connected. We run jobs that finish on time and to spec. 

/ 01

Temporary Traffic Management

Stop/go, lane closures, two-way light systems and full carriageway closures - designed, signed and stewarded to Chapter 8. 

Forecasted road closures, diversions, advanced warnings and public access management.

Route Planning & Road Closures

/ 02

/ 03

Portable Signals & Managed Lights Hire

2, 3 and 4 way radio-linked portable signals. Battery or hybrid units, delivered, installed and serviced for the duration of the works.

Excavation, ducting, chambers and reinstatement, plus telegraph pole supply, placement and recovery - the groundwork the network is built on.

Light Civil Engineering & Poling

/ 04

/ 05

Overhead and underground cabling, blowing and pulling, fusion splicing, and full OTDR and power-meter test and handover

Fibre Deployment, Splicing & Testing

/ 06

Final-drop and in-home installation of broadband and other systems - activated, speed-tested and handed over as a working service. 

Customer Connections

- WHY YOTTAWATT -

Operational discipline, on every job.

We don't sub-contract our reputation. Every operative on site is employed, accredited and managed against a single set of standards - the same whether its a council schedule or a 30-minute emergency callout.

24/7 emergency response, southwest dispatch

NRSWA / LANTRA Streetworks qualified operatives

Chapter 8 compliant signing, lighting & guarding

Live job tracking and on-site documentation

Civils, poling, fibre & connection deliver in-house

Screenshot 2026-05-08 at 14.00.36.png

- APPROACH - 

How a job runs.

From first call to demobilisation. A defined four-stage process so every project - planned or reactive - is delivered against a clear standard.

STAGE 01

Brief & survey

Site walk, traffic count, risk assessment. We design the scheme around your works - not a template. 

STAGE 02

Plans & permits

Drawings, road space booking and Streetworks notices submitted on your behalf. No paperwork sent back.

STAGE 03

Mobilise

Crews, kit and signage on site, on time. Pre-shift briefings logged. Live progress shared with your PM.

Manage & close

STAGE 04

Daily checks, reactive cover and full demob. Sign-off pack delivered with sign sheets and incident logs.

Planning a project, or need a crew on site soon?

- GET STARTED -

Request a quote
Yottawatt TM Logo_edited.png

© 2026 Yottawatt

bottom of page